Public Notice for Soliciting Opinions on the Environmental Impact of the Technical Renovation Project for Mercedes-Benz GLE-Class Vehicles (Model T167) by Beijing Benz Automotive Co., Ltd.


 

According to the requirements of the "Environmental Impact Assessment Law of the People's Republic of China" and the "Measures for Public Participation in Environmental Impact Assessment", the Environmental Impact Assessment Report (Draft for Comments) for the technical transformation project of the Mercedes-Benz - Mercedes-Benz GLE class car ( T167 model) is hereby announced to understand the public's attitude towards the construction of this project and their opinions and suggestions on environmental protection, and to accept public supervision.

(1) Overview of the construction project

This project involves no additional land acquisition area, with an additional building area of 345 square meters. The project plans to implement technical transformation within the Shunyi factory, purchasing advanced domestic and foreign production process equipment and auxiliary equipment for the stamping workshop, welding workshop, painting workshop, final assembly workshop, logistics system, quality system, R&D system, IT system, etc., to complete the adaptation and transformation of the existing stamping, welding, painting, and final assembly production lines. Simultaneously, the factory buildings and related public power facilities such as electricity, heat, water supply and drainage, fire protection, and power, as well as basic supporting facilities, will be renovated. After the project is completed, T167 the model will be flexibly produced on the same line with other high-end passenger car models, and the Shunyi factory will maintain its current 15 ten thousand vehicles / annual production capacity unchanged.

(2) Methods for the public to review the report

1 1. Online link to the draft report for comments :

Link: https://pan.baidu.com/s/1OmqYHr7kAsYSShXoYsyY3w?pwd=pp3x

Extraction code: pp3x

2 2. Methods and channels to review the paper report : The public can visit Beijing Benz Automotive Co., Ltd. to review the paper report.

(3) Scope of the public solicited for opinions

Citizens, legal persons, and other organizations involved within a 2.5 kilometer range extended outward from the factory site and boundary.

(4) Environmental Impact Report preparation unit

Name of the Environmental Impact Report preparation unit: Beijing United Intelligence Certification Co., Ltd.

(5) Online link to the public opinion form

Online link to the public opinion survey form:

Link: https://pan.baidu.com/s/1q-lwjvINwNOIZDZ8oyxppQ?pwd=5581

Extraction code: 5581

( Note : According to the "Measures for Public Participation in Environmental Impact Assessment" regulations, , opinions or demands related to land acquisition, demolition, property, employment, and other matters unrelated to the project's environmental impact assessment are not part of the public participation content for the project EIA. ) See attachment.

(6) Methods and channels for the public to submit opinions

The public can contact the construction unit by phone, email, and other means , to provide suggestions and opinions related to the environmental impact and environmental protection measures of this project. Contact information is as follows :

Name of the construction unit: Beijing Benz Automotive Co., Ltd.

Contact person: Engineer Zhong

Contact phone: 010-67815753

Email: zhongxw@bbac.com.cn

(7) Start and end time for the public to submit opinions

Announcement and public opinion solicitation period : From the date of announcement 10 working days. The construction unit will truthfully record the public's opinions and suggestions , and provide reasonable feedback.

 

 

 

 

 

Beijing Benz Automotive Co., Ltd.

2024 Year 11 Month 11 Day

 

 

Related News


The national zero-carbon factory policy is now in effect! United Zhiye provides precise support to help clients seize the initiative in their transformation.

Based on the strategic plan proposed by the headquarters, United Zhiye takes the upgrade of its product system as a key driver to build a three-tiered business structure—comprising “zero-carbon factory solutions + carbon-related products + integrated comprehensive services”—and thereby develop end-to-end service capabilities. The original enterprise’s integrated approach to low-carbon development has been upgraded to an integrated approach to zero-carbon development, which we regard as a milestone event. While the zero-carbon factory business focuses on deepening engagement in the manufacturing sector, the integrated approach to zero-carbon enterprise development transcends industry boundaries, extending its reach to the service sector and thus covering a broader scope of services.


For the first time, technology-based small and medium-sized enterprises have been included in the scope of tiered cultivation for high-quality SMEs.

Recently, the Ministry of Industry and Information Technology issued the latest revised "Administrative Measures for the Tiered Cultivation of High-Quality Small and Medium-Sized Enterprises" (hereinafter referred to as the "Measures"), which have expanded the scope of cultivation by including technology-based SMEs in the tiered cultivation system for the first time. In the future, the tiered system for high-quality SMEs will encompass technology- and innovation-driven SMEs, specialized, refined, distinctive, and innovative SMEs, and "Little Giant" enterprises that are specialized, refined, distinctive, and innovative. The "Measures" will take effect from April 1, 2026.


Five departments jointly issued the "Guiding Opinions on Carrying Out the Construction of Zero-Carbon Factories."

Recently, five departments—the Ministry of Industry and Information Technology, the National Development and Reform Commission, the Ministry of Ecology and Environment, the State-owned Assets Supervision and Administration Commission of the State Council, and the National Energy Administration—jointly issued the "Guiding Opinions on Promoting the Construction of Zero-Carbon Factories" (MIIT Joint [2026] No. 13, hereinafter referred to as the "Guiding Opinions"). These opinions aim to tap deeply into the potential for energy conservation and carbon reduction in the industrial and information technology sectors, drive carbon reduction and efficiency improvements in key industries, promote a green and low-carbon transformation, and foster the development of new-quality productive forces.


Notice on Certification Risk Management and Standard Implementation Services | Top Management of Certified Organizations Must Complete Training on the New Version of Quality Management System Certification Rules

This standardization effort will provide an in-depth interpretation of the new version of the rules and systematically analyze the significant changes and implementation requirements of the new rules in areas such as audit procedures, responsibilities of top management, evidence management, and risk control.


Understand at a Glance | Guangdong Province’s Zero-Carbon Park Development Plan

Recently, the Guangdong Provincial Development and Reform Commission, the Guangdong Provincial Department of Industry and Information Technology, the Guangdong Provincial Department of Ecology and Environment, and the Guangdong Provincial Energy Administration jointly issued the "Guangdong Province Zero-Carbon Park Construction Plan."

Related Downloads

Related News

undefined

undefined