Certification Encyclopedia | Checklist of Three-System Audit Materials for Construction Enterprises
Release Date:
2020-08-18 15:56
Source:
How should construction companies prepare for the three-system audit? Here is a checklist of materials for the three-system audit of construction companies. Compare and see which materials your company needs to prepare!
2. Procedure Documents.
3. Company Internal Audit Record Forms.
4. Management Review (plans, reports from various departments, review reports, etc.), records of corrective/preventive actions.
2. Complete inspection records of each project by the company's quality and safety department.
3. Complete occupational health examination reports for personnel engaged in toxic/harmful, high-altitude, or special types of work related to occupational health and safety.
4. Calibration/verification of testing equipment such as grounding resistance testers, theodolites, and levels used for curtain wall installation lightning protection grounding must be within the valid period.
5. Complete list and maintenance records of on-site construction machinery and equipment.
6. Complete approval of construction organization design (prepared by the engineering department, approved by the design department) and submission for review to the supervision party.
7. Staffing of the project department (project manager, project leader, safety officer, quality officer, construction worker, etc.) and complete qualification certificates.
8. Qualification certificates of operators (electricians, welders), three-level safety education before operators enter the site, and safety technical disclosure by the project department to operators (both parties must sign).
9. Self-inspection of building materials/equipment/reinforcement upon entry and submission for inspection to the supervision party.
10. Complete records of construction drawing reviews, Q&A, and construction logs.
11. Inspection records of door and window, curtain wall process steps, self-inspection and third-party inspection records of concealed works, tests for four properties (wind, water, sealing), pull tests, material witness sampling, and records of third-party inspections must be complete.
12. Distribution of labor supplies (safety helmets, safety belts, work clothes), and arrangements for meals/accommodation of on-site workers?
13. How to handle on-site solid waste (such as discarded sealant cans, paint buckets, welding slag) (whether handed over to the general contractor or disposed of by the supplier).
14. Construction contracts and bid award notices.
15. Complete customer satisfaction survey materials (surveys of the client for completed projects regarding quality, progress, civilized construction, warranty service, etc.).
16. Complete plans and records for on-site hot work and high-risk operations.
17. Whether suspended baskets are used for on-site curtain wall construction (must provide a qualified use certificate issued after third-party inspection).
18. Complete records of rectification notices and responses from the general contractor and supervision.
19. Complete set of completion acceptance materials (mainly checking the completion acceptance reports signed and stamped by the construction party, client, supervision party, and design party).
2. Management policies and management objectives.
3. List of registered employees (try not to present this; Ingle charges audit fees based on personnel, so the number reported to Ingle should be less than the actual company personnel. If the auditor wants to see it, handle it technically; the auditor mainly looks at social security payment slips from recent months).
4. Employee social security payment list.
5. Group accident insurance list.
6. Personnel demand form.
7. Training demand form.
8. Training records.
9. Annual training plan.
10. Employee assessment forms.
11. Resignation approval forms.
12. Labor relationship termination approval forms.
13. Human resources development plan.
14. Job descriptions.
15. Fire protection and lightning protection acceptance letters.
16. Hazard source investigation forms, identification and evaluation of company environmental factors and hazard sources, updated evaluation dates, quantified objectives, decomposed indicators, and inspection records.
17. Special equipment certificates.
18. List of labor protection supplies.
19. Firefighting equipment list, layout plans of firefighting facilities, fire escape routes and signage.
20. Safety responsibility letters from each department.
21. Emergency plans for handling safety and fire accidents.
22. List of qualification certificates for certified personnel.
23. Decomposition and implementation report of management objectives (including data analysis) (management objectives must be broken down annually to each department and assessed for annual completion).
24. Controlled document list (management manual, procedure document distribution/collection records).
25. Document change request forms.
26. Quality/environment/safety record lists.
27. Personnel Demand Application Form
28. Training Demand Form
29. List of Applicable Laws, Regulations, and Other Requirements
30. Safety Training Certificates for Enterprise Leaders, Safety Management Personnel Certificates (Safety Engineers)
31. ISO45001 System Document List and Manual;
32. Identification of Hazard Sources and Environment and Risk Assessment
33. Management Plans, Emergency Plans, Drill Records, Preparation of Emergency Essential Supplies
34. Process Control Records
35. Management Objectives
36. Monitoring and Measurement Control
37. "Three Simultaneities" Acceptance Report
38. Occupational Health Pre-evaluation Report
39. Workplace Harmful Factors Monitoring Plan and Report
40. Occupational Health Examination Report for Personnel Exposed to Harmful Factors
41. Fire Acceptance Report
42. Lightning Protection Facility Monitoring Report
43. Mandatory Inspection Report for Special Equipment and Its Safety Attachments (Forklifts, Cranes, Elevators, Air Compressors, Air Tanks and Pressure Gauges/Safety Valves, Other Pressure Vessels, etc.)
44. Special Equipment Use Permit (Forklifts, Elevators, Cranes, Air Tanks, etc.)
45. Special Operations Personnel Qualification Certificates or Copies
46. Compliance Assessment of Laws, Regulations, and Other Requirements
47. System Planning
48. Company Qualifications, Safety Production License, Industrial Product Production License (if required)
49. Proof of Payment for Various Funds, Insurances, and Social Security
50. Roster of Current Employees, Annual Training Plan, Execution Records of Training Plan
51. Department Responsibilities of Human Resources? Employee Job Responsibilities? Organizational Structure of Occupational Health and Safety Management System
52. New Employee Records, Employment Traces, Safety Education, Factory Rules and Regulations, and "Three Systems" Training and Exam Papers
53. Internal Auditor Training Records and Appointment
54. Energy Saving Promotion
55. Methods and Channels for Obtaining and Promoting Applicable Laws, Regulations, and Other Requirements List
56. Annual Physical Examination Reports for Special Operations Personnel, Physical Examination Reports for Canteen Staff, Catering License, Contract for Disposal of Food Waste
57. Contracts and Annual Batch Processing Records for Industrial Waste Disposal Produced by Workshops
58. Document and Record List
59. Channels and Handling Methods for External Documents
60. Relevant Data Analysis and Processing in Company Business Activities
61. Completion Status and Countermeasures of Policies and Objectives
2. Supplier On-site Evaluation Form
3. Qualified Supplier Directory
4. Supplier Periodic Evaluation Form
5. Material Supply Ledger
6. Sample Inspection Records
7. Contact Sheet
8. Purchase Requisition
9. Quality Issue Feedback Form
10. Purchase Order
11. Product Sample Status Form
12. Purchase Contract/Delivery Note, etc.
13. Material Contract (The contract must include clauses imposing environmental, occupational health, and safety requirements on the supplier); the supplier must be listed in the annual qualified supplier directory.
2. Technical Parameter Table for Glue Dispensing Machines
3. Equipment/Facility Purchase Application Form
4. Equipment/Mold Maintenance Application Form
5. Equipment/Facility Acceptance Form
6. Equipment Maintenance Plan
7. Equipment Daily Maintenance Records
8. Equipment Repair and Maintenance Records
9. Equipment Operation Records
10. Equipment/Facility Scrap Application Form
11. "Mold Ledger"
12. Facility Inspection Records
13. Engineering Drawings/Technical Document Change Notice
14. Product Sample Status Form
15. Quality Incident Report Form
16. Corrective Action Handling Form
17. Preventive Action Handling Form
18. Process Defect Report Form
19. Quality Issue Feedback Form
20. Equipment/Facility Ledger
21. Equipment Purchase Order
22. Process Discipline Inspection Form
23. Door and Window Sample Process Status Form
24. Document List
25. Document change request forms.
26. Material Requisition Form
27. Warehouse Receipt
28. Return Order
29. Qualified Product Warehouse Receipt
30. Incoming Inspection Notice
31. Record List
32. Personnel Demand Application Form
33. Training Demand Form
34. Monthly Production Plan
35. Weekly Production Plan
36. Production Task Order
37. Weekly Shipping Plan
38. Production Workshop Area Identification
39. Processing Site Status Identification
40. Product Shipping List Receipt
41. Key and Special Process Identification
42. Key and Special Process Operation Manual
2. Aluminum Alloy Curtain Wall Caulking Process Inspection Record
3. Aluminum Alloy Profile Incoming Inspection Record
4. Plastic Profile Incoming Inspection Record
5. Reinforced Steel Incoming Inspection Record
6. Sealing Strip Inspection Record
7. Hardware Accessories Incoming Inspection Record
8. Spare Parts and Auxiliary Materials Incoming Inspection Record
9. Corner Strength Test Record
10. Glass Incoming Inspection Record
11. Emergency (Exception) Release Application Form
12. Aluminum Alloy Door and Window Curtain Wall Cutting Inspection Record
13. Aluminum Alloy Door and Window Curtain Wall Punching Process Inspection Record
14. Aluminum Alloy Door and Window Curtain Wall Milling Process Inspection Record
15. Drilling Process Inspection Record
16. Aluminum Alloy Door and Window Curtain Wall Frame Assembly Process Inspection Record
17. Aluminum Alloy Door and Window Curtain Wall Sash Assembly Process Inspection Record
18. Press Strip and Sealant (Caulking) Process Inspection Record
19. Hardware Assembly Process Inspection Record
20. Plastic Door and Window Cutting Inspection Record
21. Plastic Door and Window Steel Lining Process Inspection Record
22. Plastic Door and Window Milling Process Inspection Record
23. Plastic Door and Window Welding and Corner Cleaning Inspection Record
24. Plastic Door and Window Assembly Process Inspection Record
25. Steel Frame Cutting Inspection Record
26. Steel Frame Finished Product Inspection Record
27. Aluminum Alloy Door and Window, Curtain Wall Finished Product Incoming Inspection Record
28. Plastic Door and Window Finished Product Incoming Inspection Record
29. Curtain Wall Assembly Inspection Record
30. Aluminum Alloy Door and Window Curtain Wall Caulking Process Inspection Record
31. Completion Acceptance Record
32. Periodic Calibration Schedule (Plan)
33. Tape Measure Internal Calibration Record
34. Key Raw Material Supplier Change Application Form
35. Measuring Instrument Management Ledger
36. Measuring Instrument Scrap Application Form
37. Tape Measure Internal Calibration Record
38. Process Monitoring and Measurement Record
39. Quality Objective Statistics Table
40. Quality Objective Assessment Form
41. External Document List
42. Incoming Inspection Notice
43. Quality Issue Feedback Form
44. Product Sample Status Record
45. Quality Incident Report Form
46. Corrective Action Handling Form
47. Preventive Action Handling Form
48. Door and Window Frame, Subframe Installation Inspection Record
49. Door and Window Glass Installation Inspection Record
50. Door and Window Leaf Installation Inspection Record
51. Project Construction Reward and Punishment Form
52. Rectification (Rework, Repair) Notice
53. Curtain Wall Welding Process Inspection Record
54. Customer Satisfaction Survey Record
55. Customer Satisfaction Statistical Analysis Form
56. Customer Feedback (Complaint) Record
57. Corrective Action Handling Form
58. Preventive Action Handling Form
59. Process Defect Report Form
60. Quality Issue Information Feedback Form
61. Quality Accident Report Form
62. Door and Window Sample Process Status Form
63. Door and Window Sample Process Status Form
64. Quality Issue Information Feedback Form
65. After-sales Service Return Visit and Repair Receipt
66. After-sales Service Repair Form
67. Document List
68. Document Change Request Form
69. Record List
70. Personnel Requirement Application Form
71. Training Requirement Form
2. Technical Document Registration and Distribution Record
3. Market Information Report
4. Design/Development Plan and Task Book
5. Design/Development Input List
6. Design/Development Output List
7. Product Catalog
8. Design/Development Review Report
9. Information Transmission Form
10. Design/Development Verification Report
11. Design/Development Change Request Form
12. Process Improvement Contact Form
13. Customer Provided Technical Document Acceptance Form
14. Monthly Project Design Plan
15. Engineering Drawing/Technical Document Change Notice
16. External Document List
17. Quality Accident Report Form
18. Drawing Review/Design Disclosure Record
19. Purchase Order
20. Various Technical Parameter Tables of Glue Dispensing Machine
21. Process Discipline Inspection Form
22. Product Sampling Status Form
23. Document Application Form
24. Document List
25. Document change request forms.
26. Record List
27. Personnel Demand Application Form
28. Training Demand Form
2. Bid Document Review Record
3. Contract Review Record
4. Bid Quotation Sample Confirmation Form
5. Document Application Form
6. Document List
7. Document Change Request Form
8. Record List
9. Bidding Materials (including tender documents, Q&A, quotations, etc.) and Review Process Records
10. Winning Bid Notice
11. Project Contract and Filing
2. Bid Document Review Record
3. Contract Review Record
4. Bid Quotation Sample Confirmation Form
5. Document List
6. Document Change Request Form
7. Record List
8. Personnel Requirement Application Form
9. Training Requirement Form
2. Special Funds for Environmental Improvement
3. Special Funds for Employee Welfare
4. Annual Energy Consumption Cost Comparison Record (Energy Consumption per Ten Thousand Yuan of Output Value Decreasing Over the Years)